{"id":2622,"date":"2007-12-31T14:48:01","date_gmt":"2007-12-31T18:48:01","guid":{"rendered":"http:\/\/spacingtoronto.ca\/?p=2622"},"modified":"2008-04-09T20:51:23","modified_gmt":"2008-04-10T01:51:23","slug":"the-end-of-bostons-big-dig","status":"publish","type":"post","link":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/","title":{"rendered":"The end of Boston&#8217;s Big Dig"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg\" height=\"360\" width=\"500\" \/><\/p>\n<p><strong>BOSTON &#8212;<\/strong> The most widely publicized attempt to rejuvenate a city scarred by an elevated expressway concludes today: Boston&#8217;s Big Dig has officially come to an end. The underground tunnels replacing the above ground I-93 are now fully operational.<\/p>\n<p>To give you an idea of the scope of this kind of project, Michael Dukakis, the Democratic presidential candidate who lost spectacularly to George H.W. Bush in 1988, was ending his term as Massachusetts governor when the Big Dig started.<\/p>\n<p>As <a href=\"http:\/\/news.yahoo.com\/s\/ap\/20071225\/ap_on_re_us\/big_dig_the_end;_ylt=Ampp0KRA_yHW3sxiEHX5tr5saMYA\">an Associated Press article describes<\/a>, it was a construction project to rival anything an urban environment has ever seen. At $12 billion and five years late in arrival, its story involves engineering wonderwork, corruption, and a tunnel collapse that led to a manslaughter charge against a contractor.<\/p>\n<p>The actual mechanics of the Big Dig are probably well-known to engineering enthusiasts, as they faced the problem of trying to create an underground expressway without de-stabilizing the elevated expressway that still lay above it.<\/p>\n<p>Most other people will take pleasure in this astonishing series of <a href=\"http:\/\/news.yahoo.com\/nphotos\/Boston-Big-Dig\/ss\/events\/us\/122507bigdigtunnel\/s:\/ap\/20071225\/ap_on_re_us\/big_dig_the_end\/im:\/071225\/480\/99c40be99ad34ec5ac30e98a824159ff\/\">before<\/a> and <a href=\"http:\/\/news.yahoo.com\/nphotos\/Boston-Big-Dig\/ss\/events\/us\/122507bigdigtunnel\/s:\/ap\/20071225\/ap_on_re_us\/big_dig_the_end\/im:\/071225\/480\/6894763dc46246b2a002fef125baf1be\/\">after<\/a> pictures, many of which have been taken as sections of the expressway have been replaced over the past few years.<\/p>\n<p>While all underground aspects of the project are finished, about 18 months of above ground work remain, including the final destruction of what remains of the expressway. The project will open up 30 acres of land in the downtown core.<\/p>\n<p>Also check out a <a href=\"http:\/\/www.flickr.com\/photos\/antydiluvian\/sets\/72157603089493074\/\">series of photos<\/a> on Flickr dedicated to the new green space created by the Big Dig.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BOSTON &#8212; The most widely publicized attempt to rejuvenate a city scarred by an elevated expressway concludes today: Boston&#8217;s Big Dig has officially come to an end. The underground tunnels replacing the above ground I-93 are now fully operational. To give you an idea of the scope of this kind of project, Michael Dukakis, the<a href=\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/\">Continue reading <span class=\"sr-only\">&#8220;The end of Boston&#8217;s Big Dig&#8221;<\/span><\/a><\/p>\n","protected":false},"author":4045,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[47,9],"tags":[7764,499,3143,7761,7763,1211,1164,7762,21,391],"class_list":["post-2622","post","type-post","status-publish","format-standard","hentry","category-parks","category-traffic","tag-associated-press","tag-boston","tag-contractor","tag-democratic-presidential-candidate","tag-george-h-w-bush","tag-governor","tag-massachusetts","tag-michael-dukakis","tag-other-cities","tag-usd"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The end of Boston&#039;s Big Dig - Spacing Toronto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The end of Boston&#039;s Big Dig - Spacing Toronto\" \/>\n<meta property=\"og:description\" content=\"BOSTON &#8212; The most widely publicized attempt to rejuvenate a city scarred by an elevated expressway concludes today: Boston&#8217;s Big Dig has officially come to an end. The underground tunnels replacing the above ground I-93 are now fully operational. To give you an idea of the scope of this kind of project, Michael Dukakis, theContinue reading &quot;The end of Boston&#8217;s Big Dig&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/\" \/>\n<meta property=\"og:site_name\" content=\"Spacing Toronto\" \/>\n<meta property=\"article:published_time\" content=\"2007-12-31T18:48:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2008-04-10T01:51:23+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg\" \/>\n<meta name=\"author\" content=\"David Pal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Spacing\" \/>\n<meta name=\"twitter:site\" content=\"@Spacing\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"David Pal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/\",\"url\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/\",\"name\":\"The end of Boston's Big Dig - Spacing Toronto\",\"isPartOf\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg\",\"datePublished\":\"2007-12-31T18:48:01+00:00\",\"dateModified\":\"2008-04-10T01:51:23+00:00\",\"author\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/c7f7b793f13f4169a08a6783edc5910c\"},\"breadcrumb\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#primaryimage\",\"url\":\"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg\",\"contentUrl\":\"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/spacing.ca\/toronto\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The end of Boston&#8217;s Big Dig\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\",\"url\":\"https:\/\/spacing.ca\/toronto\/\",\"name\":\"Spacing Toronto\",\"description\":\"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/spacing.ca\/toronto\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/c7f7b793f13f4169a08a6783edc5910c\",\"name\":\"David Pal\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/41820beb907d738986b06eb62068fceb?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/41820beb907d738986b06eb62068fceb?s=96&d=blank&r=g\",\"caption\":\"David Pal\"},\"sameAs\":[\"http:\/\/spacing.ca\/wire\"],\"url\":\"https:\/\/spacing.ca\/toronto\/author\/davidpal\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The end of Boston's Big Dig - Spacing Toronto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/","og_locale":"en_US","og_type":"article","og_title":"The end of Boston's Big Dig - Spacing Toronto","og_description":"BOSTON &#8212; The most widely publicized attempt to rejuvenate a city scarred by an elevated expressway concludes today: Boston&#8217;s Big Dig has officially come to an end. The underground tunnels replacing the above ground I-93 are now fully operational. To give you an idea of the scope of this kind of project, Michael Dukakis, theContinue reading \"The end of Boston&#8217;s Big Dig\"","og_url":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/","og_site_name":"Spacing Toronto","article_published_time":"2007-12-31T18:48:01+00:00","article_modified_time":"2008-04-10T01:51:23+00:00","og_image":[{"url":"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg","type":"","width":"","height":""}],"author":"David Pal","twitter_card":"summary_large_image","twitter_creator":"@Spacing","twitter_site":"@Spacing","twitter_misc":{"Written by":"David Pal","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/","url":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/","name":"The end of Boston's Big Dig - Spacing Toronto","isPartOf":{"@id":"https:\/\/spacing.ca\/toronto\/#website"},"primaryImageOfPage":{"@id":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#primaryimage"},"image":{"@id":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#primaryimage"},"thumbnailUrl":"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg","datePublished":"2007-12-31T18:48:01+00:00","dateModified":"2008-04-10T01:51:23+00:00","author":{"@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/c7f7b793f13f4169a08a6783edc5910c"},"breadcrumb":{"@id":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#primaryimage","url":"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg","contentUrl":"http:\/\/farm3.static.flickr.com\/2313\/2152669434_28d7947f2b_o.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/spacing.ca\/toronto\/2007\/12\/31\/the-end-of-bostons-big-dig\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/spacing.ca\/toronto\/"},{"@type":"ListItem","position":2,"name":"The end of Boston&#8217;s Big Dig"}]},{"@type":"WebSite","@id":"https:\/\/spacing.ca\/toronto\/#website","url":"https:\/\/spacing.ca\/toronto\/","name":"Spacing Toronto","description":"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/spacing.ca\/toronto\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/c7f7b793f13f4169a08a6783edc5910c","name":"David Pal","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/41820beb907d738986b06eb62068fceb?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/41820beb907d738986b06eb62068fceb?s=96&d=blank&r=g","caption":"David Pal"},"sameAs":["http:\/\/spacing.ca\/wire"],"url":"https:\/\/spacing.ca\/toronto\/author\/davidpal\/"}]}},"_links":{"self":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/2622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/users\/4045"}],"replies":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/comments?post=2622"}],"version-history":[{"count":0,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/2622\/revisions"}],"wp:attachment":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media?parent=2622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/categories?post=2622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/tags?post=2622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}