{"id":3971,"date":"2009-01-22T13:26:06","date_gmt":"2009-01-22T18:26:06","guid":{"rendered":"http:\/\/spacingtoronto.ca\/2009\/01\/22\/3971\/"},"modified":"2009-01-22T13:30:48","modified_gmt":"2009-01-22T18:30:48","slug":"3971","status":"publish","type":"post","link":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/","title":{"rendered":"Home Depot pulls out of Queen-Bathurst development"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg\" height=\"257\" width=\"500\" \/><\/p>\n<p>Spacing reader Darwin O&#8217;Connor pointed us towards a developing story on development: <a href=\"http:\/\/www.thestar.com\/Business\/article\/575399\">Home Depot has pulled out<\/a> of the Queen-Portland construction site.\u00a0 From the Toronto Star:<\/p>\n<blockquote><p><em> Home Depot Canada is paying an unspecified amount in cash to terminate its lease on a site along Queen Street West in Toronto being developed by RioCan Real Estate Investment Trust.<\/em><\/p>\n<p><em> RioCan said Thursday it intends to continue with the Queen and Portland development project, which has caused discomfort among artists and others in the trendy district uneasy about a big-box store.<\/em><\/p>\n<p><em> Canada&#8217;s largest REIT said it is &#8220;reviewing the possibility of repositioning the retail portion of the development to reflect a new retail footprint.&#8221;<\/em><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Spacing reader Darwin O&#8217;Connor pointed us towards a developing story on development: Home Depot has pulled out of the Queen-Portland construction site.\u00a0 From the Toronto Star: Home Depot Canada is paying an unspecified amount in cash to terminate its lease on a site along Queen Street West in Toronto being developed by RioCan Real Estate<a href=\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/\">Continue reading <span class=\"sr-only\">&#8220;Home Depot pulls out of Queen-Bathurst development&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1022,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[20],"tags":[457,7727,11309,3200,11307,428,316,11308,7271,5800,339,19,341],"class_list":["post-3971","post","type-post","status-publish","format-standard","hentry","category-urban-design","tag-canada","tag-construction-site","tag-darwin-oconnor","tag-home-depot","tag-home-depot-canada","tag-portland","tag-queen","tag-retail-footprint","tag-retail-portion","tag-riocan-real-estate-investment-trust","tag-the-toronto-star","tag-toronto","tag-toronto-star"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Home Depot pulls out of Queen-Bathurst development - Spacing Toronto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Home Depot pulls out of Queen-Bathurst development - Spacing Toronto\" \/>\n<meta property=\"og:description\" content=\"Spacing reader Darwin O&#8217;Connor pointed us towards a developing story on development: Home Depot has pulled out of the Queen-Portland construction site.\u00a0 From the Toronto Star: Home Depot Canada is paying an unspecified amount in cash to terminate its lease on a site along Queen Street West in Toronto being developed by RioCan Real EstateContinue reading &quot;Home Depot pulls out of Queen-Bathurst development&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/\" \/>\n<meta property=\"og:site_name\" content=\"Spacing Toronto\" \/>\n<meta property=\"article:published_time\" content=\"2009-01-22T18:26:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2009-01-22T18:30:48+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg\" \/>\n<meta name=\"author\" content=\"Matthew Blackett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Spacing\" \/>\n<meta name=\"twitter:site\" content=\"@Spacing\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Matthew Blackett\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/\",\"url\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/\",\"name\":\"Home Depot pulls out of Queen-Bathurst development - Spacing Toronto\",\"isPartOf\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg\",\"datePublished\":\"2009-01-22T18:26:06+00:00\",\"dateModified\":\"2009-01-22T18:30:48+00:00\",\"author\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/4f3b818d7e3504a6e4626afc774b2574\"},\"breadcrumb\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#primaryimage\",\"url\":\"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg\",\"contentUrl\":\"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/spacing.ca\/toronto\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Home Depot pulls out of Queen-Bathurst development\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\",\"url\":\"https:\/\/spacing.ca\/toronto\/\",\"name\":\"Spacing Toronto\",\"description\":\"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/spacing.ca\/toronto\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/4f3b818d7e3504a6e4626afc774b2574\",\"name\":\"Matthew Blackett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3eb8fd719ea39ea94dc1b32911c80f51?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3eb8fd719ea39ea94dc1b32911c80f51?s=96&d=blank&r=g\",\"caption\":\"Matthew Blackett\"},\"description\":\"Matthew Blackett is the publisher, creative director and one of the founders of Spacing magazine. He is the author, editor, and photographer of 11 books. He is also a graphic artist, product designer, and deeply-committed advocate for Toronto. TWITTER: @MatthewBlackett INSTAGRAM: @MatthewBlackett\",\"url\":\"https:\/\/spacing.ca\/toronto\/author\/matt\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Home Depot pulls out of Queen-Bathurst development - Spacing Toronto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/","og_locale":"en_US","og_type":"article","og_title":"Home Depot pulls out of Queen-Bathurst development - Spacing Toronto","og_description":"Spacing reader Darwin O&#8217;Connor pointed us towards a developing story on development: Home Depot has pulled out of the Queen-Portland construction site.\u00a0 From the Toronto Star: Home Depot Canada is paying an unspecified amount in cash to terminate its lease on a site along Queen Street West in Toronto being developed by RioCan Real EstateContinue reading \"Home Depot pulls out of Queen-Bathurst development\"","og_url":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/","og_site_name":"Spacing Toronto","article_published_time":"2009-01-22T18:26:06+00:00","article_modified_time":"2009-01-22T18:30:48+00:00","og_image":[{"url":"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg","type":"","width":"","height":""}],"author":"Matthew Blackett","twitter_card":"summary_large_image","twitter_creator":"@Spacing","twitter_site":"@Spacing","twitter_misc":{"Written by":"Matthew Blackett","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/","url":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/","name":"Home Depot pulls out of Queen-Bathurst development - Spacing Toronto","isPartOf":{"@id":"https:\/\/spacing.ca\/toronto\/#website"},"primaryImageOfPage":{"@id":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#primaryimage"},"image":{"@id":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#primaryimage"},"thumbnailUrl":"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg","datePublished":"2009-01-22T18:26:06+00:00","dateModified":"2009-01-22T18:30:48+00:00","author":{"@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/4f3b818d7e3504a6e4626afc774b2574"},"breadcrumb":{"@id":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#primaryimage","url":"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg","contentUrl":"http:\/\/farm3.static.flickr.com\/2232\/2186263638_fd92fcf1d0.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/spacing.ca\/toronto\/2009\/01\/22\/3971\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/spacing.ca\/toronto\/"},{"@type":"ListItem","position":2,"name":"Home Depot pulls out of Queen-Bathurst development"}]},{"@type":"WebSite","@id":"https:\/\/spacing.ca\/toronto\/#website","url":"https:\/\/spacing.ca\/toronto\/","name":"Spacing Toronto","description":"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/spacing.ca\/toronto\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/4f3b818d7e3504a6e4626afc774b2574","name":"Matthew Blackett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3eb8fd719ea39ea94dc1b32911c80f51?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3eb8fd719ea39ea94dc1b32911c80f51?s=96&d=blank&r=g","caption":"Matthew Blackett"},"description":"Matthew Blackett is the publisher, creative director and one of the founders of Spacing magazine. He is the author, editor, and photographer of 11 books. He is also a graphic artist, product designer, and deeply-committed advocate for Toronto. TWITTER: @MatthewBlackett INSTAGRAM: @MatthewBlackett","url":"https:\/\/spacing.ca\/toronto\/author\/matt\/"}]}},"_links":{"self":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/3971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/users\/1022"}],"replies":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/comments?post=3971"}],"version-history":[{"count":0,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/3971\/revisions"}],"wp:attachment":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media?parent=3971"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/categories?post=3971"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/tags?post=3971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}