{"id":48570,"date":"2014-05-30T08:00:02","date_gmt":"2014-05-30T12:00:02","guid":{"rendered":"http:\/\/spacing.ca\/toronto\/?p=48570"},"modified":"2014-06-03T12:32:59","modified_gmt":"2014-06-03T16:32:59","slug":"spacing-investigation-part-3","status":"publish","type":"post","link":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/","title":{"rendered":"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership"},"content":{"rendered":"<p><a href=\"http:\/\/spacing.ca\/toronto\/2014\/05\/28\/spacing-investigation-part-1-political-movements-behind-scarborough-subway\/feature-spacing-investigation\/#main\" rel=\"attachment wp-att-48518\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-48518\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/feature-spacing-investigation-600x105.gif\" alt=\"feature-spacing investigation\" width=\"600\" height=\"105\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/feature-spacing-investigation-600x105.gif 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/feature-spacing-investigation-300x52.gif 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/feature-spacing-investigation-940x164.gif 940w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>When Toronto city council convened in July, 2013, to make a clear decision on the Scarborough subway conversion, City staff provided an estimate on the cost: $2.3 billion, <a href=\"http:\/\/www.toronto.ca\/legdocs\/mmis\/2013\/cc\/bgrd\/backgroundfile-60243.pdf\">as outlined in a PDF document<\/a>. Three months later, Toronto council approved, by a vote of 24-20, a phased-in property tax increase that will raise $910 million over 30 years \u2014 a figure, its proponents claimed, that represented the final piece of the Scarborough subway funding puzzle.<\/p>\n<p>By that point, the Ontario government had diverted $1.48 billion (2010 dollars) from the original Scarborough RT conversion funding envelope (about $350 million was transferred from the initial $1.8 billion Scarborough LRT budget to the Eglinton Crosstown project). And the federal Conservatives, responding to a direct appeal from Mayor Rob Ford, anted up another $660 million.<\/p>\n<p>All in, the City has $3.05 billion in dedicated funds (2014 dollars), less the $85 million it owes to Metrolinx for sunk costs associated with the previous work done on the Scarborough LRT. At over $400 million per kilometre, the three-stop Scarborough line will be almost <a href=\"http:\/\/www.ttc.ca\/Spadina\/About_the_Project\/Overview.jsp\">33% more expensive than the Spadina extension<\/a> (set to <a href=\"http:\/\/www.ttc.ca\/Spadina\/About_the_Project\/FAQ.jsp\">open in 2016<\/a>), which is a kilometre longer and has twice as many stations.<\/p>\n<p>But is that enormous sum even enough to build the Scarborough subway? Moreover, did council \u2014 and Queen\u2019s Park \u2014 make this momentous decision with a full understanding of the costs?<\/p>\n<p>From the beginning, Stintz and de Baeremaeker sought to minimize the additional expense, claiming that a subway was only $500 million more than the $1.8 billion LRT (for a total of $2.3 billion). By June 2013, according to briefing notes obtained by <em>Spacing<\/em>, Metrolinx officials, in discussions with the City and the ministry of transportation (MTO), were pegging the addiotnal costs at $925 million, meaning a subway would cost $2.7 billion.<\/p>\n<p>But that $925 million may have been a low-ball estimate. <em>Spacing<\/em> obtained a May, 2013, \u201cbusiness case analysis,\u201d prepared by John Howe, Metrolinx\u2019s vice-president for investment strategy and sent to two senior provincial officials, Carol Layton and David Black, on June 28, 2013. It suggests the $3 billion overall subway cost estimate may fall hundreds of millions of dollars short of the mark. (Howe oversaw the Metrolinx effort to find new revenue tools to fund The Big Move.)<\/p>\n<p>\u201cThe subway is at a very preliminary (pre-EA) design stage and therefore it is prudent to apply an optimism bias uplift, typically + 40% to 50% for Capital cost estimates,\u201d the memo explains. \u201cA lower rate of optimism bias uplift is applicable to the LRT scheme, reflecting a much more advanced status of the designs. Applying 45% optimism bias for the subway scheme and 12% optimism bias for the LRT scheme, a cost differential of $1.5 billion is derived.\u201d<\/p>\n<p>In other words, since the subway plans are very preliminary, the amount by which its costs might exceed the current estimate is much higher than for the well-developed LRT plans. That means that, once all the real-world expenses are tallied up, the subway could end up costing as much as $3.3 billion. According to the briefing note, that number doesn\u2019t even include a range of other expenses, nor does it account for the fact that the original allocations are given in 2011 dollars.<\/p>\n<p>Howe\u2019s memo also outlined a range of other concerns relating to capital costs, operating implications and construction risk. Written well before council and the province hammered out a deal, this document is the clearest articulation of Metrolinx\u2019s reservations about the proposed change in direction.<\/p>\n<p>What\u2019s more, the fact that these concerns were communicated to senior provincial officials in late June. 2013 indicates that Murray\u2019s office would have \u2014 or should have \u2014 known about the financial analysis. There\u2019s nothing on the record to indicate, however, that Murray publicly discussed the total possible cost, much of which would be born by Toronto taxpayers.<\/p>\n<h3>LOW RIDERSHIP PREDICTION<\/h3>\n<p>In addition to the costs issue, the Metrolinx memo addressed the problem of expected ridership. The travel forecast for 2031 on the Scarborough RT corridor shows a \u201cmaximum flow\u201d of approximately 11,000 passengers per peak direction per hour. That figure IS not even half of a subway\u2019s capacity (25,000 passengers), and less than the LRT capacity of 15,000 passengers. \u201cIt is therefore concluded that the additional capacity of subway technology is not required and does not add value to the scheme,\u201d the memo stated. \u201cThis initial assessment suggests the volume of benefit likely required to justify the switch to subway construction will not be generated and the switch would not represent good value for money.<\/p>\n<p>\u201cWhile further analysis could create a more definitive statement,\u201d the memo continued, \u201cpreliminary analysis indicates that the subway scheme will not represent a good use of public investment dollars\u2026.\u201d<\/p>\n<p>The Metrolinx memo also had warnings about the risk of further delay \u2014 as much as six years \u2014 given the current state of the Scarborough RT. \u201cThe SRT is considered life expired by the TTC who [sic] describe the state of the infrastructure and the vehicles as &#8216;approaching critical.&#8217; It may therefore be necessary to provide bus replacement service for the SRT during all or part of this six year period.\u201d<\/p>\n<p>On the question of connecting transit investment to planning goals, the Metrolinx memo observes that new subway stations on the Scarborough line at Sheppard and McCowan, and Lawrence and McCowan \u201cprovide little or no opportunity to intensify land use in the vicinity of these stations, negating the potential to support provincial TOD [transit-oriented development] policies and to create growth nodes around these major transit interchange facilities.\u201d<\/p>\n<p>Finally, Howe flagged other significant cost question marks:<\/p>\n<ul>\n<li>The <a href=\"http:\/\/www.toronto.ca\/legdocs\/mmis\/2013\/cc\/bgrd\/backgroundfile-60278.pdf\">realignment of the line [PDF]<\/a> under Scarborough Town Centre \u2014 the subway will pass beneath the mall whereas the LRT would have skirted to the south of the property \u2014 \u201cis likely to be costly and will inconvenience users of the existing McCowan SRT station&#8221;;<\/li>\n<li>\u201cThe subway option is likely to eliminate the possibility of an extension of this corridor to Malvern Town Centre in the long term;\u201d<\/li>\n<li>If the new GO interchange at Kennedy station becomes more popular with people traveling downtown, \u201cthe benefit of providing through service [on] the Bloor-Danforth subway to Scarborough\u2026would diminish.\u201d<\/li>\n<\/ul>\n<p>\u201cAt this stage,\u201d the Metrolinx memo warned MTO, \u201cno further work to quantify or monetize these issues has been undertaken.\u201d<\/p>\n<p>As it turns out, these potential concerns excluded one other key element.<\/p>\n<p><strong><em>Part 4 on Monday: Won&#8217;t somebody think of Bombardier?<\/em><br \/>\n<\/strong><\/p>\n<p><em><strong><em><strong>preface: <a href=\"http:\/\/spacing.ca\/toronto\/2014\/05\/28\/spacing-investigation-timeline-scarborough-subway\/\">Timeline<\/a><\/strong><\/em><br \/>\nPart 1: <a href=\"http:\/\/spacing.ca\/toronto\/?p=48509\">The political machinations behind the Scarborough Subway<\/a><\/strong><\/em><br \/>\n<em><strong>Part 2: <a href=\"http:\/\/spacing.ca\/toronto\/?p=48543\">\u201cIt\u2019ll be over my dead body that Scarborough goes wanting for high speed transit\u201d <\/a><\/strong><\/em><br \/>\n<em><strong>Part 3: <a href=\"http:\/\/spacing.ca\/toronto\/?p=48570\">Ignoring the projected high costs and low ridership<\/a><\/strong><\/em><br \/>\n<em><strong>Part 4: <a href=\"http:\/\/spacing.ca\/toronto\/2014\/06\/02\/spacing-investigation-part-4-wont-somebody-think-bombardier\/\">Won&#8217;t somebody think of Bombardier?<\/a><br \/>\n<\/strong><\/em><br \/>\n<em><strong>Part 5: <a href=\"http:\/\/spacing.ca\/toronto\/2014\/06\/03\/spacing-investigation-part-5-bottom-line-scarborough-subway\/\">The bottom line on the Scarborough subway line<\/a><br \/>\n<\/strong><\/em><\/p>\n<p><em>photo by <a href=\"https:\/\/flic.kr\/p\/borhtw\">Himy Syed<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>When Toronto city council convened in July, 2013, to make a clear decision on the Scarborough subway conversion, City staff provided an estimate on the cost: $2.3 billion, as outlined in a PDF document. Three months later, Toronto council approved, by a vote of 24-20, a phased-in property tax increase that will raise $910 million<a href=\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/\">Continue reading <span class=\"sr-only\">&#8220;SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership&#8221;<\/span><\/a><\/p>\n","protected":false},"author":4051,"featured_media":48584,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[2,8],"tags":[],"class_list":["post-48570","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","category-transit"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership - Spacing Toronto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership - Spacing Toronto\" \/>\n<meta property=\"og:description\" content=\"When Toronto city council convened in July, 2013, to make a clear decision on the Scarborough subway conversion, City staff provided an estimate on the cost: $2.3 billion, as outlined in a PDF document. Three months later, Toronto council approved, by a vote of 24-20, a phased-in property tax increase that will raise $910 millionContinue reading &quot;SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/\" \/>\n<meta property=\"og:site_name\" content=\"Spacing Toronto\" \/>\n<meta property=\"article:published_time\" content=\"-0001-11-30T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2014-06-03T16:32:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1825\" \/>\n\t<meta property=\"og:image:height\" content=\"985\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Lorinc\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Spacing\" \/>\n<meta name=\"twitter:site\" content=\"@Spacing\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Lorinc\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/\",\"url\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/\",\"name\":\"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership - Spacing Toronto\",\"isPartOf\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg\",\"datePublished\":\"-0001-11-30T00:00:00+00:00\",\"dateModified\":\"2014-06-03T16:32:59+00:00\",\"author\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/faff9da0e20b8f5223099d707e940d8e\"},\"breadcrumb\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#primaryimage\",\"url\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg\",\"contentUrl\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg\",\"width\":1825,\"height\":985},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/spacing.ca\/toronto\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\",\"url\":\"https:\/\/spacing.ca\/toronto\/\",\"name\":\"Spacing Toronto\",\"description\":\"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/spacing.ca\/toronto\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/faff9da0e20b8f5223099d707e940d8e\",\"name\":\"John Lorinc\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/73e05cb61860b63be76ffccf72a4d736?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/73e05cb61860b63be76ffccf72a4d736?s=96&d=blank&r=g\",\"caption\":\"John Lorinc\"},\"url\":\"https:\/\/spacing.ca\/toronto\/author\/john\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership - Spacing Toronto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/","og_locale":"en_US","og_type":"article","og_title":"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership - Spacing Toronto","og_description":"When Toronto city council convened in July, 2013, to make a clear decision on the Scarborough subway conversion, City staff provided an estimate on the cost: $2.3 billion, as outlined in a PDF document. Three months later, Toronto council approved, by a vote of 24-20, a phased-in property tax increase that will raise $910 millionContinue reading \"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership\"","og_url":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/","og_site_name":"Spacing Toronto","article_published_time":"-0001-11-30T00:00:00+00:00","article_modified_time":"2014-06-03T16:32:59+00:00","og_image":[{"width":1825,"height":985,"url":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg","type":"image\/jpeg"}],"author":"John Lorinc","twitter_card":"summary_large_image","twitter_creator":"@Spacing","twitter_site":"@Spacing","twitter_misc":{"Written by":"John Lorinc","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/","url":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/","name":"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership - Spacing Toronto","isPartOf":{"@id":"https:\/\/spacing.ca\/toronto\/#website"},"primaryImageOfPage":{"@id":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#primaryimage"},"image":{"@id":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#primaryimage"},"thumbnailUrl":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg","datePublished":"-0001-11-30T00:00:00+00:00","dateModified":"2014-06-03T16:32:59+00:00","author":{"@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/faff9da0e20b8f5223099d707e940d8e"},"breadcrumb":{"@id":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#primaryimage","url":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg","contentUrl":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2014\/05\/scarborough-poster.jpg","width":1825,"height":985},{"@type":"BreadcrumbList","@id":"https:\/\/spacing.ca\/toronto\/2014\/05\/30\/spacing-investigation-part-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/spacing.ca\/toronto\/"},{"@type":"ListItem","position":2,"name":"SPACING INVESTIGATION, PART 3: Ignoring the projected high costs and low ridership"}]},{"@type":"WebSite","@id":"https:\/\/spacing.ca\/toronto\/#website","url":"https:\/\/spacing.ca\/toronto\/","name":"Spacing Toronto","description":"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/spacing.ca\/toronto\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/faff9da0e20b8f5223099d707e940d8e","name":"John Lorinc","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/73e05cb61860b63be76ffccf72a4d736?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/73e05cb61860b63be76ffccf72a4d736?s=96&d=blank&r=g","caption":"John Lorinc"},"url":"https:\/\/spacing.ca\/toronto\/author\/john\/"}]}},"_links":{"self":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/48570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/users\/4051"}],"replies":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/comments?post=48570"}],"version-history":[{"count":15,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/48570\/revisions"}],"predecessor-version":[{"id":48633,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/48570\/revisions\/48633"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media\/48584"}],"wp:attachment":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media?parent=48570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/categories?post=48570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/tags?post=48570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}