{"id":51613,"date":"2015-04-17T09:30:10","date_gmt":"2015-04-17T13:30:10","guid":{"rendered":"http:\/\/spacing.ca\/toronto\/?p=51613"},"modified":"2015-04-21T22:26:05","modified_gmt":"2015-04-22T02:26:05","slug":"parks-crisis-wabash-park-system-actually-worked","status":"publish","type":"post","link":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/","title":{"rendered":"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park"},"content":{"rendered":"<p><a href=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/feature-parks-crisis-600.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-51381\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/feature-parks-crisis-600-600x115.jpg\" alt=\"feature-parks crisis-600\" width=\"600\" height=\"115\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/feature-parks-crisis-600-600x115.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/feature-parks-crisis-600-300x58.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/feature-parks-crisis-600-940x180.jpg 940w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/feature-parks-crisis-600.jpg 1200w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>On a warm spring afternoon, the park on the corner of <a href=\"https:\/\/www.google.ca\/maps\/place\/Toronto,+ON\/data=!4m2!3m1!1s0x882b344b0a2d5f59:0xea8cd0fbee6e7f04?sa=X&amp;ei=1wcxVcvEPM2pogTj64GIAg&amp;ved=0CB0Q8gEwAA\">Sorauren and Wabash<\/a> avenues in the west Toronto neighbourhood of Parkdale looks like a perfect dream of urban open space: a city block of green bordered by tree-lined streets, families with strollers, kids playing lacrosse, and neighbours mingling at the farmer\u2019s market whose winter home is in an early 20th-century brick office building that\u2019s now a renovated fieldhouse. There\u2019s even a guy on stilts making balloon animals.<\/p>\n<p>By all appearances, this park \u2014 the go-to spot for thousands of residents in a fast-growing neighbourhood \u2014 looks like a triumph of good planning and community engagement. The park even gets a lot of the credit for new investment pouring into a formerly industrial corner of Parkdale.<\/p>\n<p>Sorauren Park \u2014 bounded by Sorauren Avenue, Wabash Avenue and the railway tracks that will soon carry passengers to Pearson Airport \u2014 is, in fact, all those things.<\/p>\n<p>Its most recent expansion, the creation of what\u2019s called the Sorauren Park Town Square, is one a handful of recent parks projects \u2014 all of them partnerships between the city, local residents and philanthropic funders \u2014 that are heralded as the shining examples of the city\u2019s parks policy and resource allocation. \u201cHow is it that civilization stays together?\u201d Ward 14 city councillor Gord Perks asked at the Town Square opening last summer. \u201cThe answer is right here behind you.\u201d<\/p>\n<p>But it\u2019s also an astonishing example of the hurdles and hoops the city throws up as obstacles for even the most deserving and forward-looking parks projects and their hard-working supporters.<\/p>\n<p>The neighbourhood has these facilities because open space activists have spent two decades jumping \u2014 as well as bowing, scraping, baking, schmoozing and strategizing \u2014 to assemble the crazy-quilt of funding required to create high-functioning open space.<\/p>\n<p>They even managed to pry loose a <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/15\/parks-crisis-sidebar-section-42-works\/\">small amount of Section 42 money<\/a>, which makes them the only small park partnership project in recent years to tap into vast parkland reserve fund that the city has been sitting on, like some municipal <a href=\"http:\/\/en.wikipedia.org\/wiki\/Smaug\">Smaug<\/a> hoarding dwarf gold.<\/p>\n<p>Even so, the city is still asking local activists to sweat for every park amenity, right down to the benches and the bicycle rings they are currently in the process of adding to the new square.<\/p>\n<p>When <em>Spacing<\/em> set out to find Toronto park development success stories that were exceptions to the city\u2019s reluctance to allocate funds to parks projects, we were repeatedly pointed toward such partnerships.<\/p>\n<p>Yet many of these projects are modest playground expansions in suburban areas far from the downtown wards that generated tens of millions in park levies. They include the $350,000-plus rebuilding of the Jamie Bell Adventure Playground in High Park; $200,000 spent to buy and plant black cedars to restore the Hedge Maze on Centre Island; and a $250,000 multi-use rejuvenation of the Rotary Peace Park on Lake Ontario in New Toronto.<\/p>\n<p>But the $405,000 Sorauren Park Town Square is the only partnership that drew on the Section 42 funding. Of that total, only slightly more than 10%\u2013$48,000\u2013came out of the parkland reserves.<\/p>\n<p>The neighbourhood, led first by long-time residents and community parks activists, has waged a fierce and lengthy battle for every square metre of green space and recreational improvements in a space that served, until the early 1990s, as a TTC bus repair yard, and was destined to become a new mega-facility for public works.<\/p>\n<p>Residents fought that plan until the city capitulated. It spent $1.2 million to clean up the industrial contamination on the property. Parks contractors covered the 2.4 ha brownfield site with soil, planted trees, and built a baseball diamond and tennis courts.<\/p>\n<p>Then, almost as soon as the park opened in 1995, neighbourhood residents launched a campaign to persuade the city to renovate the linseed oil complex into a recreational centre for the under-served community, which had begun attracting new residents and millions of dollars in loft conversion investment.<\/p>\n<p>The city bought the old Canada Linseed Oil Mills buildings for $2-million in 2000. But, pleading poverty, the city maintained it could not afford the $20 million-plus investment in the recreation centre, and even sought proposals for a public-private partnership that would see condos built on the site to help finance recreational facilities.<\/p>\n<p>The sole P3 proposal proved unfeasible. But it showed the Sorauren activists they could not risk waiting for the city\u2013or risk seeing the linseed property sold to a developer. They set up an incorporated entity to carry the plan forward, establishing the <a href=\"http:\/\/www.buildwabashnow.org\/\">Wabash Building Society<\/a> (WBS) to raise money for park improvements themselves.<\/p>\n<p><a href=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabash-dsc00304-new.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-51621\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabash-dsc00304-new-600x394.jpg\" alt=\"parks crisis wabash dsc00304 new\" width=\"600\" height=\"394\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabash-dsc00304-new-600x394.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabash-dsc00304-new-300x197.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabash-dsc00304-new-940x617.jpg 940w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabash-dsc00304-new.jpg 1000w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>WBS decided to start small. The group proposed a $400,000 renovation of the derelict linseed oil administrative office \u2013 a charming brick building with deco-style features that once operated as an after-hours speakeasy \u2013 into a fieldhouse. After it opened in 2008, the City of Toronto and the Wabash Building Society were awarded Canadian Urban Institute\u2019s Brownie Award for successfully converting a \u201cbrownfield\u201d site for community use.<\/p>\n<p>The City directed Section 37 funds from nearby loft development projects to improve the fieldhouse, now in constant use by community groups. This project provided the Wabash Building Society with a track record when it came time to tackle the next stage of their park reno plan.<\/p>\n<p>It also taught them the value of taking what long-time members call \u201cbaby steps.\u201d In 2009, the WBS set out to raise the $405,000 needed to transform land that had once held the linseed company\u2019s grain elevator into a 21&#215;27-metre square that can be used for local events, such as dances and outdoor films, as well as the farmer\u2019s market.<\/p>\n<p>When this new \u201ctown square\u201d was officially opened last summer, its funding story could be seen clearly on the banner thanking donors: somewhere close 200 names, the culmination of five years of bake sales and funds donated in memory of loved ones who had themselves loved the park.<\/p>\n<p>The largest sum, $155,000, came from City of Toronto capital funding. Other contributions included $125,000 from a Live Green grant; $61,000 from the Wabash Building Society\u2019s Reserve Fund; $16,000 from community fundraising and the Toronto Parks and Trees Foundation; and $48,000 from the Section 42 parkland fund.<\/p>\n<p>How did the Wabash Building Society manage to score that cash?<\/p>\n<p>Sorauren Park activists praise their elected representatives, especially Ward 14 councillor Perks, for paving a pragmatic and principled way to City Hall. \u201cHe\u2019s been a brick,&#8221; said neighbourhood realtor Chander Chaddah, who has been on the Wabash Building Society board since its inception. Perks, in turn, credits former Ward 27 councillor Kyle Rae for teaching him how to successfully negotiate access to municipal funding on behalf of constituents.<\/p>\n<h2>Strategic civic panhandling<\/h2>\n<p>\u201cWin win win\u201d has been the WBS mantra for what\u2019s now going on a decade. (\u201cIt\u2019s been a bit of a process,\u201d Chaddah said, \u201cbut an enjoyable and happy process.\u201d) Yet the strategic panhandling continues. Sorauren Park Town Square has been the recipient of $10,000 from the TD Bank\u2019s Friends of the Environment foundation, money used to purchase and plant 48 new trees and shrubs, which will be cared for by community volunteers over the next two years.<\/p>\n<p>According to Rob Richardson, manager of Toronto\u2019s PFR Partnership Development office, Sorauren Park activists recently raised an additional $11,400 for six new benches for the town square. In addition, Metrolinx \u2014 which will soon operate UP Express along the park\u2019s eastern boundary\u00a0 \u2014 provided $1,000 for 12 bike rings. The next community fundraising phase is aimed at building a trellis on one side of the square as well as an open-air community bake oven.<\/p>\n<p>The strategy during the Ford administration was to keep public investment in community parks development under the radar. \u201cWe snuck this into the budget so that the person elected four years ago never found out,\u201d Perks said at the July, 2014, Town Square opening. The plan, parks supporters confided, has been to keep funding tiny projects that inch across the park until they are back to where this group started a decade ago: at the factory building the WBS has always hoped would some day become a community centre.<\/p>\n<p>As of last week, it looks like the Sorauren Park activists will get what they want. The process that Perks calls \u201cincrementally recapturing and building on this space over a generation\u201d has paid off. City council has allocated $34-million toward the design and construction of the Wabash Community Centre in its 2014 to 2023 capital budget. The project is now seventh on a list of eight approved community centres for under-served Toronto neighbourhoods.<\/p>\n<p>The community is cautiously optimistic. \u201cWhile the news is encouraging,\u201d the WBS wrote on <a href=\"http:\/\/www.buildwabashnow.org\">buildwabashnow.org<\/a> blog, \u201cthe community centre has been a line item in the City\u2019s budget since at least 2000.\u201d<\/p>\n<p>The moral of the Sorauren Park story is that even the most effective communities must recognize that creating a new full-service public park is something to be done for the next generation. WBS activists praise themselves for their fortitude, but they also point out that the children that were <em>in utero<\/em> during the inaugural meetings are now old enough to attend meetings as young adults. \u201cAll the stars have to align,\u201d one of the WBS founders said. \u201cSometimes it takes a long time for that to happen.\u201d<\/p>\n<p>Perks, for his part, said the city needs to adopt a completely new mindset about open space. \u201cIt\u2019s a public infrastructure issue. People have start thinking of parks the way they think of sidewalks.\u201d<\/p>\n<p><em><strong>Part 1:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/13\/parks-in-crisis-part-1-all-built-up-and-no-place-to-go\/\">All built up but no place to grow<br \/>\n<\/a><\/em><em><strong>Part 2:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/14\/parks-crisis-part-2-money-flows\/\">Where the money flows<\/a><\/em><br \/>\n<em><strong>Part 3:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/15\/parks-crisis-perils-cash-lieu\/\">The perils of cash-in-lieu<\/a><\/em><br \/>\n<em><strong>Part 3 sidebar:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/15\/parks-crisis-sidebar-section-42-works\/\">Section 42 explained<\/a><\/em><br \/>\n<em><strong>Part 4:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/16\/parks-crisis-part-4-tale-two-parks\/\">The tale of two parks<\/a><\/em><br \/>\n<em><strong>Part 5:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\">The system worked (slowly) for a west end park<\/a><\/em><br \/>\n<em><strong>Part 6:<\/strong> <a href=\"http:\/\/spacing.ca\/toronto\/2015\/04\/21\/parks-crisis-part-6-privately-owned-public-spaces-answer-parks-deficit\/\">Are privately-owned public spaces the answer to parks deficit?<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On a warm spring afternoon, the park on the corner of Sorauren and Wabash avenues in the west Toronto neighbourhood of Parkdale looks like a perfect dream of urban open space: a city block of green bordered by tree-lined streets, families with strollers, kids playing lacrosse, and neighbours mingling at the farmer\u2019s market whose winter<a href=\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\">Continue reading <span class=\"sr-only\">&#8220;PARKS IN CRISIS part 5: The system worked (slowly) for a west end park&#8221;<\/span><\/a><\/p>\n","protected":false},"author":8265,"featured_media":51618,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[21758,13,18,47,2],"tags":[],"class_list":["post-51613","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community","category-green-space","category-neighbourhoods","category-parks","category-politics"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>PARKS IN CRISIS part 5: The system worked (slowly) for a west end park - Spacing Toronto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park - Spacing Toronto\" \/>\n<meta property=\"og:description\" content=\"On a warm spring afternoon, the park on the corner of Sorauren and Wabash avenues in the west Toronto neighbourhood of Parkdale looks like a perfect dream of urban open space: a city block of green bordered by tree-lined streets, families with strollers, kids playing lacrosse, and neighbours mingling at the farmer\u2019s market whose winterContinue reading &quot;PARKS IN CRISIS part 5: The system worked (slowly) for a west end park&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\" \/>\n<meta property=\"og:site_name\" content=\"Spacing Toronto\" \/>\n<meta property=\"article:published_time\" content=\"2015-04-17T13:30:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2015-04-22T02:26:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1045\" \/>\n\t<meta property=\"og:image:height\" content=\"567\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kimberley Noble\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Spacing\" \/>\n<meta name=\"twitter:site\" content=\"@Spacing\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kimberley Noble\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\",\"url\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\",\"name\":\"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park - Spacing Toronto\",\"isPartOf\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg\",\"datePublished\":\"2015-04-17T13:30:10+00:00\",\"dateModified\":\"2015-04-22T02:26:05+00:00\",\"author\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/64d4c51e8b3c57d90485db62013f4013\"},\"breadcrumb\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#primaryimage\",\"url\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg\",\"contentUrl\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg\",\"width\":1045,\"height\":567},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/spacing.ca\/toronto\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\",\"url\":\"https:\/\/spacing.ca\/toronto\/\",\"name\":\"Spacing Toronto\",\"description\":\"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/spacing.ca\/toronto\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/64d4c51e8b3c57d90485db62013f4013\",\"name\":\"Kimberley Noble\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0750bc37fae9fffbabe930b461497e4e?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0750bc37fae9fffbabe930b461497e4e?s=96&d=blank&r=g\",\"caption\":\"Kimberley Noble\"},\"url\":\"https:\/\/spacing.ca\/toronto\/author\/kimberleynoble\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park - Spacing Toronto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/","og_locale":"en_US","og_type":"article","og_title":"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park - Spacing Toronto","og_description":"On a warm spring afternoon, the park on the corner of Sorauren and Wabash avenues in the west Toronto neighbourhood of Parkdale looks like a perfect dream of urban open space: a city block of green bordered by tree-lined streets, families with strollers, kids playing lacrosse, and neighbours mingling at the farmer\u2019s market whose winterContinue reading \"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park\"","og_url":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/","og_site_name":"Spacing Toronto","article_published_time":"2015-04-17T13:30:10+00:00","article_modified_time":"2015-04-22T02:26:05+00:00","og_image":[{"width":1045,"height":567,"url":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg","type":"image\/jpeg"}],"author":"Kimberley Noble","twitter_card":"summary_large_image","twitter_creator":"@Spacing","twitter_site":"@Spacing","twitter_misc":{"Written by":"Kimberley Noble","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/","url":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/","name":"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park - Spacing Toronto","isPartOf":{"@id":"https:\/\/spacing.ca\/toronto\/#website"},"primaryImageOfPage":{"@id":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#primaryimage"},"image":{"@id":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#primaryimage"},"thumbnailUrl":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg","datePublished":"2015-04-17T13:30:10+00:00","dateModified":"2015-04-22T02:26:05+00:00","author":{"@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/64d4c51e8b3c57d90485db62013f4013"},"breadcrumb":{"@id":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#primaryimage","url":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg","contentUrl":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2015\/04\/parks-crisis-wabashcommunitycentre_concept.jpg","width":1045,"height":567},{"@type":"BreadcrumbList","@id":"https:\/\/spacing.ca\/toronto\/2015\/04\/17\/parks-crisis-wabash-park-system-actually-worked\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/spacing.ca\/toronto\/"},{"@type":"ListItem","position":2,"name":"PARKS IN CRISIS part 5: The system worked (slowly) for a west end park"}]},{"@type":"WebSite","@id":"https:\/\/spacing.ca\/toronto\/#website","url":"https:\/\/spacing.ca\/toronto\/","name":"Spacing Toronto","description":"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/spacing.ca\/toronto\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/64d4c51e8b3c57d90485db62013f4013","name":"Kimberley Noble","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0750bc37fae9fffbabe930b461497e4e?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0750bc37fae9fffbabe930b461497e4e?s=96&d=blank&r=g","caption":"Kimberley Noble"},"url":"https:\/\/spacing.ca\/toronto\/author\/kimberleynoble\/"}]}},"_links":{"self":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/51613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/users\/8265"}],"replies":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/comments?post=51613"}],"version-history":[{"count":8,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/51613\/revisions"}],"predecessor-version":[{"id":51677,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/51613\/revisions\/51677"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media\/51618"}],"wp:attachment":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media?parent=51613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/categories?post=51613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/tags?post=51613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}