{"id":64798,"date":"2022-01-18T08:30:50","date_gmt":"2022-01-18T13:30:50","guid":{"rendered":"http:\/\/spacing.ca\/toronto\/?p=64798"},"modified":"2022-04-19T21:44:50","modified_gmt":"2022-04-20T01:44:50","slug":"from-sunlight-park-to-east-harbour-part-1-of-2","status":"publish","type":"post","link":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/","title":{"rendered":"From Sunlight Park to East Harbour (Part 1 of 2)"},"content":{"rendered":"<p>In July, 2021, the developer Cadillac Fairview introduced a revised plan for the transformation of the former Unilever soap manufacturing site in the Lower Don Valley into a business and residential district called East Harbour. <a href=\"https:\/\/urbantoronto.ca\/news\/2021\/07\/resubmission-proposes-residential-additions-east-harbour-plan\" target=\"_blank\" rel=\"noopener\">The plan<\/a> shows 17 glass-clad towers up to 64 storeys tall crowded onto a grid of streets next to a transit station.<\/p>\n<p>Under the guise of \u201cplace making,\u201d the proposed development would involve the demolition of all the existing buildings on the site, thus eliminating the visible traces of its industrial past. This proposal contrasts with the <a href=\"https:\/\/henninglarsen.com\/en\/projects\/1700-1799\/1783-east-harbour-toronto\/\" target=\"_blank\" rel=\"noopener\">imaginative plan<\/a> submitted by the previous owner, First Gulf, and <a href=\"http:\/\/app.toronto.ca\/tmmis\/viewAgendaItemHistory.do?item=2018.MM44.121\" target=\"_blank\" rel=\"noopener\">approved by Toronto City Council in July, 2018<\/a>, which would have preserved industrial buildings.<\/p>\n<p>The 102-year history of Lever Brothers soap manufacturing in the lower Don Valley is actually a story of two factories built 50 years apart along the east bank of the river. Although the two occupied adjacent sites, they were separated by the corridor that still carries rail traffic east from Union Station.<\/p>\n<figure id=\"attachment_64840\" aria-describedby=\"caption-attachment-64840\" style=\"width: 600px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-64840\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-600x402.jpg\" alt=\"\" width=\"600\" height=\"402\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-600x402.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-300x201.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-768x515.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-1536x1030.jpg 1536w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-2048x1373.jpg 2048w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-940x630.jpg 940w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-64840\" class=\"wp-caption-text\">Rear yard of Unilever plant, showing glycerine building and power plant, 2015.<\/figcaption><\/figure>\n<p>The subject of the first part of this feature, including the photo series below, is the surviving Lever Brothers Plant No. 2, which opened in 1950. The second part of the feature will examine Plant No. 1, which operated from 1900 until the mid-1980s, in the context of the industrial and social history of the lower Don Valley.<\/p>\n<p>After 1945, newly formulated powdered laundry detergents began to replace bar soap for washing clothes. To meet the demand, Lever Brothers of Canada decided to build an entirely new plant incorporating the latest technology, at a cost of seven million dollars. Construction began in 1948 on a large site south of the rail corridor.<\/p>\n<figure id=\"attachment_64835\" aria-describedby=\"caption-attachment-64835\" style=\"width: 600px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-64835\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-600x631.jpg\" alt=\"\" width=\"600\" height=\"631\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-600x631.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-285x300.jpg 285w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-768x808.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-1459x1536.jpg 1459w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-893x940.jpg 893w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy.jpg 1830w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-64835\" class=\"wp-caption-text\">Product display at office entrance, Unilever plant, 2015.<\/figcaption><\/figure>\n<p>This site, representing the major part of what developers are calling \u201cEast Harbour,\u201d had accommodated industrial uses since 1866, when the Gooderham and Worts distillery established its cattle sheds there. The sheds could accommodate up to 4,000 cows, nourished with grain swill left over from the distilling process that was piped across the river from the Trinity Street distillery.<\/p>\n<p>The Gooderham and Worts operation ended at some point between 1913 and 1924. An aerial survey photo taken in April, 1947 shows more that 20 oil storage tanks and assorted buildings on the site. These were demolished in 1948 to make way for the new plant, designed by the renowned engineering firm Stone and Webster.<\/p>\n<figure id=\"attachment_64804\" aria-describedby=\"caption-attachment-64804\" style=\"width: 601px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-64804\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.1.jpg\" alt=\"\" width=\"601\" height=\"444\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.1.jpg 601w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.1-300x222.jpg 300w\" sizes=\"auto, (max-width: 601px) 100vw, 601px\" \/><figcaption id=\"caption-attachment-64804\" class=\"wp-caption-text\">Detail of a 1911 insurance map showing the Gooderham and Worts cattle sheds occupying the future site of Lever Brothers Plant No. 2.<\/figcaption><\/figure>\n<p>In its original configuration, Plant No. 2 included a 7-storey main block, a glycerine refinery, a coal-fired power plant and a tall water tower. A massive spray drying tower was added to the exterior of the main block in 1983, giving a strong vertical accent to its main facade. Other additions included the warehouse and a sulfonation building.<\/p>\n<figure id=\"attachment_64803\" aria-describedby=\"caption-attachment-64803\" style=\"width: 600px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-64803\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-600x530.jpg\" alt=\"\" width=\"600\" height=\"530\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-600x530.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-300x265.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-768x679.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-1536x1358.jpg 1536w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-2048x1810.jpg 2048w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/Illustration-No.2-940x831.jpg 940w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-64803\" class=\"wp-caption-text\">Aerial view of Lever Brothers Plant No. 2 taken in April, 1951, shortly after it opened. In the background, a second gasometer is under construction on the Consumers Gas Station B site. Station B closed before 1956 and both gasometers were demolished in l969. Northway Gestalt Corporation Fonds, Archives of Ontario, C 30-1-0-3398<\/figcaption><\/figure>\n<p>My series combines photos taken in 2003 while the plant was being operated by Korex Corporation, with others showing the abandoned site in 2015. I hope to provide a more complete view of the factory complex than has been available previously, and to show that the original buildings remain structurally intact.<\/p>\n<figure id=\"attachment_64826\" aria-describedby=\"caption-attachment-64826\" style=\"width: 600px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-64826\" src=\"http:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-600x589.jpg\" alt=\"\" width=\"600\" height=\"589\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-600x589.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-300x295.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-768x754.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-1536x1508.jpg 1536w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-2048x2011.jpg 2048w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-940x923.jpg 940w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-62x62.jpg 62w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-64826\" class=\"wp-caption-text\">Detergent packaging area, second floor, Unilever plant, 2003.<\/figcaption><\/figure>\n<p>The Unilever Don Valley plant is comparable to the Distillery District as a candidate for the adaptive re-use and preservation of our industrial heritage. In addition to office space, it could accommodate artists, musicians, artisans, theatre groups, and small manufacturers.<\/p>\n<p>The success of the recent campaign to save a significant part of the nearby Dominion Wheel and Foundry complex demonstrates that Torontonians understand the connections between industrial heritage and other aspects of our social history. In my opinion, the developers and planners of East Harbour have a civic responsibility to maintain and even enhance those connections on the former Unilever site.<\/p>\n<p><em><a href=\"http:\/\/spacing.ca\/toronto\/2022\/03\/28\/from-sunlight-park-to-east-harbour-part-2-of-2\/\">Read Part 2 here<\/a>.<\/em><\/p>\n<p><strong><em>Acknowledgments<\/em><\/strong><\/p>\n<p><em>The following persons contributed to my research for this article: Adam Birrell, Michele Dale, Lisa Doherty, Dave Durette, <\/em><em>Steven Evans, <\/em><em>Gerald Hitchcock, Yoonhee Lee<\/em><\/p>\n<p><strong><em>Copyright Notice<\/em><\/strong><\/p>\n<p><em>All photos\u00a0 \u00a9 P. MacCallum, 2015 (<a href=\"https:\/\/www.petermaccallum.com\/\">petermaccallum.com<\/a>)<\/em><\/p>\n\n\t\t<div class='not-prose mt-12'><ul id='gallery-1' class='gallery galleryid-64798 gallery-columns-3 gallery-size-thumbnail grid grid-cols-3 gap-x-6 gap-y-8'><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64805' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/1.WPC-7-4-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/1.WPC-7-4-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/1.WPC-7-4-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/1.WPC-7-4-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/1.WPC-7-4-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64805'>\n\t\t\t\t\tUnilever soap factory, Don Valley Parkway and Don River, 2001.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64806' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/2.UNI-30-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/2.UNI-30-7-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/2.UNI-30-7-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/2.UNI-30-7-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/2.UNI-30-7-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64806'>\n\t\t\t\t\tBroadview Avenue, looking south toward Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64807' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/3.UNI-28-5-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/3.UNI-28-5-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/3.UNI-28-5-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/3.UNI-28-5-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/3.UNI-28-5-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64807'>\n\t\t\t\t\tNew vehicle compound south of rail corridor, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64808' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/4.UNI-27-10-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/4.UNI-27-10-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/4.UNI-27-10-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/4.UNI-27-10-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/4.UNI-27-10-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64808'>\n\t\t\t\t\tLooking west from former Consumers Gas property, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64809' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/5.UNI-26-6-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/5.UNI-26-6-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/5.UNI-26-6-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/5.UNI-26-6-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/5.UNI-26-6-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64809'>\n\t\t\t\t\tDon River pedestrian bridge, Gardiner Expressway ramp and Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64810' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64810'>\n\t\t\t\t\tLooking southeast from Corktown Common, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64811' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/7.UNI-25-6-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/7.UNI-25-6-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/7.UNI-25-6-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/7.UNI-25-6-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/7.UNI-25-6-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64811'>\n\t\t\t\t\tLooking west from roof of Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64812' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-300x298.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-600x595.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-768x762.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-1536x1524.jpg 1536w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-2048x2032.jpg 2048w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-940x933.jpg 940w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/8.KDV-15-5-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64812'>\n\t\t\t\t\tInterior of gate house, Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64813' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/9.KDV-1-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/9.KDV-1-1-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/9.KDV-1-1-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/9.KDV-1-1-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/9.KDV-1-1-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64813'>\n\t\t\t\t\tSulfonation building, Unilever plant, interior view No. 1, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64814' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/10.KDV-2-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/10.KDV-2-1-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/10.KDV-2-1-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/10.KDV-2-1-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/10.KDV-2-1-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64814'>\n\t\t\t\t\tSulfonation building, interior view No. 2, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64815' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/11.KDV-2-11.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/11.KDV-2-11-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/11.KDV-2-11-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/11.KDV-2-11-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/11.KDV-2-11-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64815'>\n\t\t\t\t\tSulfonation building, interior view No. 3, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64816' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/12.UNI-10-4-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/12.UNI-10-4-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/12.UNI-10-4-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/12.UNI-10-4-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/12.UNI-10-4-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64816'>\n\t\t\t\t\tExterior of decommissioned sulfonation building, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64817' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/13.KDV-9-12A.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/13.KDV-9-12A-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/13.KDV-9-12A-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/13.KDV-9-12A-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/13.KDV-9-12A-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64817'>\n\t\t\t\t\tMaintenace shop and change part stores third floor, Unilever plant, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64818' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/14.KDV-7-11.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/14.KDV-7-11-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/14.KDV-7-11-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/14.KDV-7-11-300x297.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/14.KDV-7-11-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/14.KDV-7-11-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64818'>\n\t\t\t\t\tBlow moulding department, fourth floor, Unilever plant, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64819' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/15.KDV-8-11.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/15.KDV-8-11-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/15.KDV-8-11-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/15.KDV-8-11-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/15.KDV-8-11-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64819'>\n\t\t\t\t\tDetail of bottle mould, blow moulding department, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64820' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/16.KDV-7-12A.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/16.KDV-7-12A-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/16.KDV-7-12A-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/16.KDV-7-12A-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/16.KDV-7-12A-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64820'>\n\t\t\t\t\tDetail of molten plastic \u201cparisons\u201d, blow moulding department, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64821' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/17.KDV-7-18.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/17.KDV-7-18-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/17.KDV-7-18-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/17.KDV-7-18-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/17.KDV-7-18-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64821'>\n\t\t\t\t\tDetail of bottle testing station, blow moulding department, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64822' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/18.KDV-9-12.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/18.KDV-9-12-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/18.KDV-9-12-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/18.KDV-9-12-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/18.KDV-9-12-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64822'>\n\t\t\t\t\tTrimming station for blow moulded jugs, third floor, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64823' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/19.KDV-10-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/19.KDV-10-5-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/19.KDV-10-5-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/19.KDV-10-5-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/19.KDV-10-5-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64823'>\n\t\t\t\t\tBottle filling line, third floor, Unilever plant, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64824' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/20.KDV-12-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/20.KDV-12-7-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/20.KDV-12-7-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/20.KDV-12-7-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/20.KDV-12-7-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64824'>\n\t\t\t\t\tBulk chemical bag feeders, Unilever plant, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64825' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/21.KDV-14-13.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/21.KDV-14-13-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/21.KDV-14-13-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/21.KDV-14-13-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/21.KDV-14-13-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64825'>\n\t\t\t\t\tMural portrait of Unilever plant manager Kevin Beck painted by resident artist Bill Salinas. 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64826' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/22.KDV-10-13-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64826'>\n\t\t\t\t\tDetergent packaging area, second floor, Unilever plant, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64827' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-300x297.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-600x594.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-768x761.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-1536x1522.jpg 1536w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-2048x2029.jpg 2048w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-940x931.jpg 940w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/23.KDV-13-5-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64827'>\n\t\t\t\t\tDetail of fluidizer for powdered detergent, fourth floor, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64828' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/24.KDV-14-16.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/24.KDV-14-16-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/24.KDV-14-16-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/24.KDV-14-16-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/24.KDV-14-16-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64828'>\n\t\t\t\t\tAir lift and covered conveyor in the Super Concentrate area, penthouse level, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64829' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/25.UNI-24-12-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/25.UNI-24-12-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/25.UNI-24-12-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/25.UNI-24-12-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/25.UNI-24-12-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64829'>\n\t\t\t\t\tRear stairwell, Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64830' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/26.KDV-15-3A.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/26.KDV-15-3A-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/26.KDV-15-3A-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/26.KDV-15-3A-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/26.KDV-15-3A-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64830'>\n\t\t\t\t\tSpray tower mural painted by Phillip Woolf, Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64831' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/27.KDV-14-8.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/27.KDV-14-8-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/27.KDV-14-8-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/27.KDV-14-8-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/27.KDV-14-8-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64831'>\n\t\t\t\t\tUpper access floor in spray tower, (known as Nozzle Land), 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64832' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/28.UNI-11-4-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/28.UNI-11-4-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/28.UNI-11-4-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/28.UNI-11-4-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/28.UNI-11-4-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64832'>\n\t\t\t\t\tDetail of furnace, lower level, spray tower, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64833' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/29.UNI-16-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/29.UNI-16-3-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/29.UNI-16-3-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/29.UNI-16-3-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/29.UNI-16-3-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64833'>\n\t\t\t\t\tDetail of whiteboard outside spray tower control room, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64834' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/30.KDV-12-16.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/30.KDV-12-16-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/30.KDV-12-16-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/30.KDV-12-16-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/30.KDV-12-16-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64834'>\n\t\t\t\t\tDetail of cone at base of spray tower, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64835' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/31.UNI-5-7-copy-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64835'>\n\t\t\t\t\tProduct display at office entrance, Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64836' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/32.UNI-22-6-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/32.UNI-22-6-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/32.UNI-22-6-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/32.UNI-22-6-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/32.UNI-22-6-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64836'>\n\t\t\t\t\tWarehouse exterior, looking south from the power plant, Unilever site, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64837' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/33.KDV-5-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/33.KDV-5-2-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/33.KDV-5-2-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/33.KDV-5-2-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/33.KDV-5-2-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64837'>\n\t\t\t\t\tAutomated conveyor system in the warehouse, Unilever plant, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64838' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/34.DV-5-11.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/34.DV-5-11-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/34.DV-5-11-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/34.DV-5-11-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/34.DV-5-11-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64838'>\n\t\t\t\t\tAn intersection in the warehouse, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64839' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/35.KDV-6-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/35.KDV-6-2-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/35.KDV-6-2-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/35.KDV-6-2-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/35.KDV-6-2-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64839'>\n\t\t\t\t\tAn aisle in the warehouse, 2003.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64840' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/36.UNI-10-7-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64840'>\n\t\t\t\t\tRear yard of Unilever plant, showing glycerine building and power plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64841' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/37.UNI-24-4-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/37.UNI-24-4-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/37.UNI-24-4-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/37.UNI-24-4-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/37.UNI-24-4-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64841'>\n\t\t\t\t\tThe power plant, looking east from roof of main building, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64842' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-300x300.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-600x600.jpg 600w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-768x768.jpg 768w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-1536x1536.jpg 1536w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-940x940.jpg 940w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10-120x120.jpg 120w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/38.UNI-4-10.jpg 2034w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64842'>\n\t\t\t\t\tCatwalk between the main building and the glycerine building Unilever plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64843' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/39.UNI-21-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/39.UNI-21-7-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/39.UNI-21-7-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/39.UNI-21-7-300x297.jpg 300w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/39.UNI-21-7-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/39.UNI-21-7-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64843'>\n\t\t\t\t\tControl monitor in the glycerine building, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64844' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/40.UNI-19-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/40.UNI-19-2-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/40.UNI-19-2-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/40.UNI-19-2-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/40.UNI-19-2-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64844'>\n\t\t\t\t\tInterior of the glycerine building, (decommissioned before 1980), 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64845' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/41.UNI-21-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/41.UNI-21-3-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/41.UNI-21-3-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/41.UNI-21-3-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/41.UNI-21-3-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64845'>\n\t\t\t\t\tDetail of pegboard, glycerine building, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64846' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/42.UNI-10-10-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/42.UNI-10-10-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/42.UNI-10-10-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/42.UNI-10-10-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/42.UNI-10-10-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64846'>\n\t\t\t\t\tSouthwest corner of the power plant, Unilever site, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64847' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/43.UNI-18-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/43.UNI-18-7-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/43.UNI-18-7-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/43.UNI-18-7-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/43.UNI-18-7-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64847'>\n\t\t\t\t\tDetail of gas burners, power plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64848' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/44.UNI-21-10.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/44.UNI-21-10-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/44.UNI-21-10-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/44.UNI-21-10-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/44.UNI-21-10-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64848'>\n\t\t\t\t\tDisc type process meter, power plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64849' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/45.UNI-19-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/45.UNI-19-3-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/45.UNI-19-3-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/45.UNI-19-3-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/45.UNI-19-3-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64849'>\n\t\t\t\t\tSteam conduit, powerplant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64850' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/46.UNI-23-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/46.UNI-23-4-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/46.UNI-23-4-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/46.UNI-23-4-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/46.UNI-23-4-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64850'>\n\t\t\t\t\tUpper catwalk, power plant, 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64851' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/47.UNI-25-1-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/47.UNI-25-1-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/47.UNI-25-1-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/47.UNI-25-1-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/47.UNI-25-1-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64851'>\n\t\t\t\t\tCoal conveyors, power plant (decommissioned before 1980), 2015.\n\t\t\t\t\t<\/span><\/li><li class='gallery-item text-sm'><a class='fancybox' rel='gallery-64798' data-title-id='gallery-caption-64852' href='https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/48.UNI-6-1-scaled.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/48.UNI-6-1-150x150.jpg\" class=\"w-full\" alt=\"\" srcset=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/48.UNI-6-1-150x150.jpg 150w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/48.UNI-6-1-62x62.jpg 62w, https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/48.UNI-6-1-120x120.jpg 120w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t<span class='wp-caption-text gallery-caption block mt-2' id='gallery-caption-64852'>\n\t\t\t\t\tThird floor, Unilever plant, after interior demolition, 2015.\n\t\t\t\t\t<\/span><\/li>\n<\/ul><\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>In July, 2021, the developer Cadillac Fairview introduced a revised plan for the transformation of the former Unilever soap manufacturing site in the Lower Don Valley into a business and residential district called East Harbour. The plan shows 17 glass-clad towers up to 64 storeys tall crowded onto a grid of streets next to a<a href=\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/\">Continue reading <span class=\"sr-only\">&#8220;From Sunlight Park to East Harbour (Part 1 of 2)&#8221;<\/span><\/a><\/p>\n","protected":false},"author":8367,"featured_media":64810,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[22,24,21832],"tags":[],"class_list":["post-64798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","category-history","category-photos"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>From Sunlight Park to East Harbour (Part 1 of 2) - Spacing Toronto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From Sunlight Park to East Harbour (Part 1 of 2) - Spacing Toronto\" \/>\n<meta property=\"og:description\" content=\"In July, 2021, the developer Cadillac Fairview introduced a revised plan for the transformation of the former Unilever soap manufacturing site in the Lower Don Valley into a business and residential district called East Harbour. The plan shows 17 glass-clad towers up to 64 storeys tall crowded onto a grid of streets next to aContinue reading &quot;From Sunlight Park to East Harbour (Part 1 of 2)&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Spacing Toronto\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-18T13:30:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-04-20T01:44:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1757\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Peter MacCallum\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Spacing\" \/>\n<meta name=\"twitter:site\" content=\"@Spacing\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Peter MacCallum\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/\",\"url\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/\",\"name\":\"From Sunlight Park to East Harbour (Part 1 of 2) - Spacing Toronto\",\"isPartOf\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg\",\"datePublished\":\"2022-01-18T13:30:50+00:00\",\"dateModified\":\"2022-04-20T01:44:50+00:00\",\"author\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/1ceca72aff9106b139f24f140a895ccb\"},\"breadcrumb\":{\"@id\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#primaryimage\",\"url\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg\",\"contentUrl\":\"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg\",\"width\":2560,\"height\":1757,\"caption\":\"Looking southeast from Corktown Common, 2015.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/spacing.ca\/toronto\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From Sunlight Park to East Harbour (Part 1 of 2)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#website\",\"url\":\"https:\/\/spacing.ca\/toronto\/\",\"name\":\"Spacing Toronto\",\"description\":\"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/spacing.ca\/toronto\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/1ceca72aff9106b139f24f140a895ccb\",\"name\":\"Peter MacCallum\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/130df2b2583a0592433615f56a863970?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/130df2b2583a0592433615f56a863970?s=96&d=blank&r=g\",\"caption\":\"Peter MacCallum\"},\"url\":\"https:\/\/spacing.ca\/toronto\/author\/petermaccallum\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"From Sunlight Park to East Harbour (Part 1 of 2) - Spacing Toronto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/","og_locale":"en_US","og_type":"article","og_title":"From Sunlight Park to East Harbour (Part 1 of 2) - Spacing Toronto","og_description":"In July, 2021, the developer Cadillac Fairview introduced a revised plan for the transformation of the former Unilever soap manufacturing site in the Lower Don Valley into a business and residential district called East Harbour. The plan shows 17 glass-clad towers up to 64 storeys tall crowded onto a grid of streets next to aContinue reading \"From Sunlight Park to East Harbour (Part 1 of 2)\"","og_url":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/","og_site_name":"Spacing Toronto","article_published_time":"2022-01-18T13:30:50+00:00","article_modified_time":"2022-04-20T01:44:50+00:00","og_image":[{"width":2560,"height":1757,"url":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg","type":"image\/jpeg"}],"author":"Peter MacCallum","twitter_card":"summary_large_image","twitter_creator":"@Spacing","twitter_site":"@Spacing","twitter_misc":{"Written by":"Peter MacCallum","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/","url":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/","name":"From Sunlight Park to East Harbour (Part 1 of 2) - Spacing Toronto","isPartOf":{"@id":"https:\/\/spacing.ca\/toronto\/#website"},"primaryImageOfPage":{"@id":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#primaryimage"},"image":{"@id":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#primaryimage"},"thumbnailUrl":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg","datePublished":"2022-01-18T13:30:50+00:00","dateModified":"2022-04-20T01:44:50+00:00","author":{"@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/1ceca72aff9106b139f24f140a895ccb"},"breadcrumb":{"@id":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#primaryimage","url":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg","contentUrl":"https:\/\/spacing.ca\/toronto\/wp-content\/uploads\/sites\/4\/2022\/01\/6.UNI-27-3-scaled.jpg","width":2560,"height":1757,"caption":"Looking southeast from Corktown Common, 2015."},{"@type":"BreadcrumbList","@id":"https:\/\/spacing.ca\/toronto\/2022\/01\/18\/from-sunlight-park-to-east-harbour-part-1-of-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/spacing.ca\/toronto\/"},{"@type":"ListItem","position":2,"name":"From Sunlight Park to East Harbour (Part 1 of 2)"}]},{"@type":"WebSite","@id":"https:\/\/spacing.ca\/toronto\/#website","url":"https:\/\/spacing.ca\/toronto\/","name":"Spacing Toronto","description":"Canadian Urbanism Uncovered  |  Toronto Architecture, Urban Design, Public Transit, City Hall, Parks, Walking, Bikes, Streetscape, History, Waterfront, Maps, Public Spaces","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/spacing.ca\/toronto\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/1ceca72aff9106b139f24f140a895ccb","name":"Peter MacCallum","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/spacing.ca\/toronto\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/130df2b2583a0592433615f56a863970?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/130df2b2583a0592433615f56a863970?s=96&d=blank&r=g","caption":"Peter MacCallum"},"url":"https:\/\/spacing.ca\/toronto\/author\/petermaccallum\/"}]}},"_links":{"self":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/64798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/users\/8367"}],"replies":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/comments?post=64798"}],"version-history":[{"count":7,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/64798\/revisions"}],"predecessor-version":[{"id":65240,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/posts\/64798\/revisions\/65240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media\/64810"}],"wp:attachment":[{"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/media?parent=64798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/categories?post=64798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/spacing.ca\/toronto\/wp-json\/wp\/v2\/tags?post=64798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}